Planet of the Humans Review

Planet of the Humans Review

Review by Don Wichert 


Michael’s Moore’s film, Planet of the Humans directed by Jeff Gibbs, is a poorly researched and conspicuously one-sided example of advocacy journalism. The film’s release on YouTube coincided with the 50th anniversary of Earth Day, prompting a well-deserved panning from many writers and reviewers with deep roots in the environmental and clean energy community.

The major shift from a world dominated by fossil fuels to one run by renewable energy is a monumental shift that cannot be made over night. Gibbs narrates a description focusing almost entirely on the slowness of this shift and on the inevitable failures of various attempts to move towards a more sustainable world. Much like evolution itself, some mutations towards this goal succeed and others don’t. It’s called “learning by doing”. Unfortunately Gibbs only describes those early experiments gone badly or interviews people who are not qualified to explain the goals and the process of development that is being considered.

Much of the reporting is one sided, not researched very well, outdated, and inaccurate and is simply inexcusable. Some examples:

  • Interviews with GM officials in 2010 when the Chevy Volt was introduced. The Volt has gotten great reviews over time as a first generation Electric Vehicle that also has a gas engine. However, since it is typically recharged from the electric grid, which at the time was powered primarily by coal from the Lansing based utility in 2010; it’s portrayed as a phony sustainable alternative. No mention was made of electric cars being 85% energy efficient vs. internal engines being 15% efficient (of energy in the fuel to the wheels on the road). Since 2010, about 100,000 megawatts of coal plants have been shut down and replaced by renewable energy or natural gas. So, the grid has become greener, and therefore driving an electric vehicle has become greener over time.
  • In the same ten year old footage, Gibbs interviews a Lansing Power and Light official who explains how their experimental solar electric system works. The panels are low efficiency (about 8%) and the official estimates that the football sized solar field can produce the equivalent of eleven household’s annual electricity usage. In the last ten years, solar has become more efficient and the costs have dropped dramatically.  Solar is now the among the most affordable ways to generate electricity in most places in the US and the world. This is not mentioned, nor is distributed solar electric power mentioned, which uses the solar energy produced and used at the site.
  • Gibbs spends a lot of time interviewing Ozzi Zehmer, author of the “Green Illusion”. Zehmer makes the outrageous claim that silicon solar cells have no silicon and instead are made of quartz, coal, and rare earth metals. It is true that some carbon is added to the solar cells in the production process, but it is subterfuge to imply that more fossil fuels are used in the process then the carbon saved by the cells over their lifetime. Many studies have shown a payback on carbon from solar cells of about two years. However, there is concern that some rare earth metals will not be enough to meet an exponential demand in the future from solar panel and other electronics. Innovation in the future may be able to resolve this apparent rare earth emerging problem.
  • Gibbs interviews a “solar salesman” at a trade show who said the lifetime of solar cells is “about 10 years.” However, every solar cell manufacturer offers a 25-year guarantee on their cells to produce at least 80% of the power by year 25. Although there is output degradation of about 0.5 percent per year, it likely that solar cells will be producing power many decades past their 25 year warrantees.
  • The movie then shifts to wind power and singles out one potential site on the Lowell mountain in Vermont. Gibbs interviews the group of hikers that are opposed to the 21 turbine ridgeline project because it will destroy the vista and hiking that has been there before. He does not mention the environmental review that was done for the project nor that the project was approved by a 342 to 114 vote in the local town in 2009. He does not interview anyone in the area that was in favor of the project, or mention the actual impact on hunting, hiking, sound, the fossil power that it’s replacing (or other conservation measures), or the economic impact of the project. Nope, just those against the project. Gibbs also interviews others at wind construction sites, who described the amount of concrete, steel, and weight of the wind turbine projects, as if all construction of anything was bad. Does he oppose a bridge over a creek because some steel and concrete is being used?
  • Gibbs also takes a slap at hydrogen used as a fuel source for autos. Even though hydrogen is not really being considered as a near-term replacement, he gets a response from a person at a trade show that the hydrogen fuel comes from fossil fuels. He does not mention that hydrogen can be made by using electrolysis of water powered by surplus renewable energy when supply exceeds demand or that the only emissions of hydrogen combustion is water.
  • The film also makes short shrift of battery technology, even though battery storage is likely to become a game changer for scaling up renewable energy. Humans are on the very beginning of a tidal wave of innovation and discovery with battery storage, with new concepts and options to store more with less weight, occurring at a rapidly increasing rate.
  • Gibbs and Zehmer then go to the southwest deserts where some large scale solar thermal to electricity systems were deployed. They visit the original site of the Solar Energy Generation System I (SEGS-I), built in 1986, 34 years ago. Out of the nine systems SEGS built over this time period they focused only on the first one, where it was dismantled and apparently is being repurposed to a newer system. No attempt was made to interview the owners of the system or to show the other eight systems that are merrily producing power at one of the sunniest sites in the US. Gibbs did show some footage of yucca plants and Joshua trees being cut down for the solar array construction. No energy system is completely benign, and tradeoffs are always made. The world is a lot different than it was before the advent of farming or the industrial revolution, and ethical choices of land use can always be challenged. Manhattan, Chicago, and Madison do not look like they did 300 years ago. The projects need to file environmental impact studies before they are built, but none of that is described.
  • There are criticisms of the solar power towers near Barstow, CA. I never liked this concept either: large, moving parts, low thermal efficiencies, and the need for maintenance. However, it is an example of how major infrastructures shifts occur: start out with what you know (large, thermal power plants) with those who build them (Bechtel, Westinghouse) and see what happens. These plants were started in the 1980’s, and in this case, their failures will hopefully lead to learning.
  • Gibbs also attacks environmentalists for taking funding from fossil fuel interest groups like the Koch brothers and others. The optics don’t look good, but most large corporations, energy or others, have a diversified portfolio of projects with new and old technologies. Sometimes old money is a major contributor to a better world in the future like the Carnegie libraries or the Rockefeller Foundations. Gibbs targets the Green Century Fund and cherry picks several companies that have a dirty image, but fails to highlight which part of these companies are being supported in the fund.
  • The film charges that any business that claims to be 100% renewably powered while remaining connected to the utility grid is engaging in deception. In point of fact, it is possible to be 100 percent renewably powered and still use some power from the grid when needed, so long as the customer offsets its draw from the grid with an equivalent amount of excess renewable energy. Until batteries are more developed, having backup sources of power, whether from the grid or other means, makes total sense. There is a picture of Tesla’s mega battery plant before the roof was covered with solar electric panels, implying that Elon Musk was lying when he said the plant would be 100 percent renewable since it would still be connected to the grid. They also showed some diesel generators being used for back-up power at an Earth Day concert.
  • But Gibbs biggest gripe is with bioenergy. He never explores the major renewable premise that biomass is recent solar energy stored in plants, or that most of the biomass feedstock is from wastes that would otherwise oxidize and slowly release methane and carbon dioxide in the process. He shows the McNeil wood-fired power plant in Burlington (VT), with piles of trees and wood chips outside ready to be burned. He never explores that 95 percent of this feedstock comes from timber product residues, culls left over after other logging operations, land clearing for development, tree trimming for power lines, forest thinning, or even dedicated biomass farms for fuel. He did not interview the fuel procurement personnel or say anything about the environmental scrutiny that is required in the fuel procurement process or anything about the sustainable guidelines that must be followed.
  • He also makes light of a biogas digester at a zoo that takes elephant manure to produce energy. He does not explore the concept of modern biogas digesters and how they take raw manure from large animal operations, or landfill and wastewater treatment gas and make electricity and pipeline quality gas. Nor does he say anything about the reduction in pathogens and smell from these operations and the production of biosolid fertilizers.
  • The film interviews a number of people living near solid waste incinerators as part of the biomass-to-energy portfolio of bad projects. It’s true that the track record of waste-to-energy plants has been spotty at best, but this is another example where projects started in the 1980’s to hedge against the energy crisis are now no longer being built. Mistakes were made, and from them, other ways to tackle problems emerge. Figuring out how best to recycle tires, hazardous wastes, and plastics is still a major problem to be solved.

There certainly are legitimate arguments being made that we humans are having a deleterious impact on the planet: over fishing of the oceans, acidification of the oceans destroying reefs, climate change impacts of more intense and frequent storms and droughts and ecosystem shifts, ground water depletion, plastic pollution, and too many people wanting too much stuff. But in Gibbs and Moore’s eyes, the glass is not half empty, but is almost dry. He completely ignores any discussion by the vast army of individuals, governments, and companies trying to fill the glass back up with clean water. No, everything anybody does is bad and evil according to the film. That includes Al Gore, Bill McKibben (founder of 350.org), Michael Brune (ED of Sierra Club), Michael Bloomberg, whose philanthropy underwrites Sierra Club’s Beyond Coal Campaign, and Dennis Hayes, coordinator of the first Earth Day in 1970. According to Gibbs, all environmental leaders are phonies and have sold out for themselves and their imperfect goals.

Renewable energy is still at an early stage of development and huge progress is being made at an accelerating pace. The first auto was made in 1885 and every year new innovations are being made. It’s almost impossible to conceive what we humans will be using for energy in the years ahead, but progress is being made every day.

The beginning of the film asks about 10 people off the street how long they think humans will survive. Guesses range from about 10 years to infinity. So there are a lot of opinions, some positive and some negative. Unfortunately, this film is all negative. It was probably meant to sound like a canary call in a coal mine, but it was way too one-sidedly negative. Things may be bad, but looking over human history, as Dr. Pangloss said in Voltaire’s Candide, “it’s the best of all possible worlds.” Too bad Moore and Gibbs didn’t do a better job researching to provide a balanced and more positive perspective on getting to the best of all possible worlds.

I cringe thinking of how right-wing media will use this film to cast doubt on the value of renewable energy and the purposeful goals of those involved in trying to make a more sustainable human earth.


Don Wichert is a self-proclaimed “Energy Geek”, with college degrees in Geography, Thermal Engineering, and Energy Analysis & Policy. He worked at the Wisconsin Energy Office for 23 years as Chief of the Energy Resources Section, was Director of the Focus on Energy Renewable Energy Program for six years, and interim Director of RENEW Wisconsin, a group he founded in 1989, for 16 months. He has served on a number of national nonprofit boards, including the Interstate Renewable Energy Council, the Clean Energy States Alliance, and the Biomass Energy Research Center. He lives in Madison, WI.

 

Solar energy at Dane County airport cleared for takeoff

Solar energy at Dane County airport cleared for takeoff

The Public Service Commission this week signed off on the newest solar farm slated for construction this year in Dane County. This solar power plant will cover 58 acres at the northern end of Dane County Regional Airport, and will involve more than 31,000 panels mounted on single-axis tracking systems. Madison Gas & Electric (MGE) will own and operate the solar plant, and expects to complete construction in the fourth quarter of 2020.

MGE’s solar field is noteworthy in that it will produce clean electricity for only one customer: Dane County. This will be the first example in Wisconsin of an offsite solar project dedicated to a single customer, albeit one with multiple facilities in MGE territory.

Through a long-term contract with MGE, Dane County will purchase the project’s output to offset its own purchases of grid-supplied electricity over the course of the facility’s 30-year-plus life. At nine megawatts (MW), the facility should produce on average 18 million kilowatt-hours a year. All told, the solar farm’s output should equate to about 40% of the electricity consumed at county-owned facilities served by MGE.

The PSC decision contained two separate approvals. First, the agency approved the power purchase agreement between MGE and Dane County, which is provided through the utility’s Renewable Energy Rider service. Under the contract, Dane County will pay 5.8 cents/kWh for electricity generated in the first year of operation, which will result in immediate savings. That price will escalate 2% per year over the contract’s term, which should track closely with anticipated increases in utility energy costs. After 30 years, Dane County will have paid off MGE’s entire investment.

The PSC also authorized the expenditure of $16 million to permit, build, and operate the solar field at the airport. The installed cost of the project equates to $1.78/watt, in line with other, smaller utility-owned projects such as MGE’s 5 MW facility now under construction at Middleton’s Morey Field.

Dane County is the third MGE customer to take service from an offsite solar array built under the Renewable Energy Rider service, following in the footsteps of the City of Middleton and the Middleton-Cross Plains Area School district. Those two customers have committed to purchase the output from a combined 1.5 MW share of the Morey Field solar array, which should commence operations in June 2020.

Notwithstanding its voluntary nature, MGE’s Renewable Energy Rider program has proven to be an attractive option for local governments that have adopted aggressive clean energy goals but are limited in their capacity to host solar systems on all their facilities. Later this year, MGE will file an application to build a 7 MW solar farm to serve the City of Madison and the Madison Metropolitan School District (MMSD). As with Dane County, MGE is the electric provider for many facilities owned by the City and MMSD. The solar array will be located near the Dane County Landfill in southeast Madison.

 

COVID-19 Resources for Wisconsin Solar Contractors

COVID-19 Resources for Wisconsin Solar Contractors

The COVID-19 crisis has resulted in many extraordinary measures to be taken by the federal, state, and local governments such as the “Safer at Home” order prohibiting groups of people from gathering and prohibiting some businesses from operating that pose a high risk of exposing their clientele to infections. These measures have resulted in a major impact on businesses in general and the solar industry in particular.

As a new affiliate of the Solar Energy Industry Association (SEIA) we will be bringing you updates that they they are able to share on the COVID 19 issue as well.  There is a lot of information there, but check out these webpages first:

SEIA: Permitting Options for Solar Installations During the COVID-19 Outbreak
SEIA: Guidance for Solar Installers, EPCs and O&M Service Providers on Managing Through the COVID-19 Pandemic

In Wisconsin, the construction industry, including solar, has been determined to be an “essential business” for the life-safety and infrastructure support benefits that it provides. Since this is new for everyone, the rules and guidance for how to operate in this environment are being created and amended regularly.

The leading solar and construction industry trade associations have developed excellent resources with FAQ’s on many of the important questions that contractors have such as:

Can contractors work inside buildings as well as outside?
Yes, but all essential businesses, to the greatest extent possible, are encouraged to use personal protective equipment where appropriate, use technology to avoid meeting in person when possible and engage in social distancing.

Do I need documentation to prove that I’m an “essential worker?”           (ABC of Wisconsin)
Essential workers do not need documentation to prove they are essential, according to state agency staff. Police are generally not going to be stopping individuals and asking for proof. In some rare instances, construction employees have been asked to provide documentation to prove they are essential and exempt from the “safer at home” order. While not required, it may be helpful and prudent to provide your employees with a letter explaining their exemption from the emergency order.

Do I need to request any type of exemption for my business?                   (ABC of Wisconsin)
The Wisconsin Economic Development Corporation (WEDC), which is the government agency charged with determining whether businesses are “essential,” has indicated that if your type of business is listed (i.e. construction) there is no need to get a designation to become exempt; you are already included under exempt. If your business type is listed as essential, there is no further action required.

Am I required to have written COVID-19 response plan? (ABC of Wisconsin)
While it is not explicitly required in the state’s order, the WEDC encourages each business to develop a written COVID-19 response plan that is unique to each individual business and type of work being done. 

If someone is positive with COVID-19, do I have to record in on my OSHA log? (ABC of Wisconsin)
Most likely, no. As an employer, you should determine whether there was any exposure that occurred in the work environment that caused or contributed to the test positive. As a practical matter, it is very difficult to do this and not practical to ascertain there was exposure on the worksite. OSHA would have to prove that the employee testing positive was work-related. If you have a COVID-19 case that results in a fatality or in-patient hospitalization, you would want to call OSHA. You would also likely be engaged with your local health department if this were to occur.

What steps should I be taking as a contractor employer?                             (ABC of Wisconsin)
Under the “General Duty” clause from OSHA, employers are to provide a safe and healthy workplace free from hazards that could cause death or serious physical harm.  Employers should follow the recommendations for the number of employees on a particular worksite and instruct employees on the practice of social distancing, or ensuring employees keep a six foot distance between one another while working. Employees should not share tools.

Employers should remind employees to take basic, preventative measures to reduce the spread of coronavirus at the workplace, including these recommendations:

   • Washing hands frequently with soap and water for at least 20 seconds or use an alcohol-based sanitizer that contains at least 60% alcohol
   • avoiding touching their eyes, nose and mouth;
   • covering sneezes or coughs with tissues, if possible, or else with a sleeve or shoulder;
   • avoiding close contact with people who are sick;
   • staying home when sick; and
   • cleaning and disinfecting frequently touched surfaces and objects.

Employers should provide adequate supplies in the workplace for employees to follow these recommended practices.

CDC guidelines for protecting employees
www.cdc.gov/coronavirus/2019-ncov/index.html 

ABC of Wisconsin Jobs Ambassador Rebecca Kleefisch discusses how contractors are addressing job site and employee safety and not taking lightly the declaration that construction is an “essential service” in Wisconsin. https://www.youtube.com/watch?v=ebRAC98RuAk&t=53s


The following websites are currently open to the public and you don’t have to be a member of the associations to access these resources.

Associated Builders and Contractors of Wisconsin
www.abcwi.org/covid-19-updates

Wisconsin Builders Association
www.wisbuild.org/news-1/covid19

Associated General Contractors of Wisconsin
www.agcwi.org/covid-19.html

Associated General Contractors of Greater Milwaukee
agc-gm.org/uncategorized/coronavirus/
agc-gm.org/news/agc-of-gm-covid-19-documents/
agc-gm.org/wp-content/uploads/2020/03/COVID-19-Recommended-Practices.JointAGC.docx

Construction Coalition Issues Joint Statement on Jobsite Safety During COVID-19 outbreak:
“Fifteen labor and management organizations in Wisconsin committed to the health, safety and welfare of our workforce and the public by issuing specific mitigation strategies to combat the COVID-19 outbreak on jobsites.”

State of Wisconsin COVID-19 Information Webpage
govstatus.egov.com/wi-covid-19

Wisconsin Department of Safety and Professional Services
dsps.wi.gov/pages/Home.aspx


We will bring you further updates as they develop. If you have specific questions please contact Jim Boullion, RENEW Wisconsin’s Director of Government Affairs at jim@renewwisconsin.org or by cell phone at (608) 695-7004.

RENEW Wisconsin Joins SEIA’s National Affiliate Network

RENEW Wisconsin Joins SEIA’s National Affiliate Network

Press release from Solar Energy Industries Association (SEIA)


WASHINGTON, D.C. and MADISON, Wis. – The Solar Energy Industries Association (SEIA), the national trade association for the U.S. solar energy industry, announced today that RENEW Wisconsin is now a formal SEIA state affiliate.

RENEW Wisconsin becomes the 18th SEIA state affiliate.

“We are thrilled to welcome RENEW Wisconsin to our network and we look forward to collaborating on policy efforts that get the state’s solar market moving again,” said Abigail Ross Hopper, president and CEO of SEIA. “As we work toward recovery from COVID-19, Wisconsin has the potential to become a regional solar leader and generate thousands of new jobs for hard-working people in the state.”

Today, Wisconsin is ranked 34th nationally with 209 megawatts of installed solar electric generating capacity. There are nearly 3,000 solar jobs in the state and those jobs are at risk as a result of the global pandemic.

“RENEW Wisconsin is excited to build our network as a new SEIA Affiliate,” said Heather Allen, Interim Executive Director of RENEW Wisconsin. “Our SEIA partners around the country are an invaluable resource as we protect renewable energy now and find opportunities to advance renewable energy in Wisconsin when this health crisis is over. Investments in solar power will keep vital dollars and family-sustaining jobs in our communities, and offer cleaner, healthier air for all of Wisconsin.”

RENEW Wisconsin is a nonprofit organization that promotes renewable energy in Wisconsin. The group works on policies and programs that expand solar power, wind power, biogas, local hydropower, geothermal energy and electric vehicles. Since 1991 RENEW Wisconsin has been a champion for clean energy solutions in the Badger State.

SEIA has developed strategic partnerships with numerous state and regional advocacy non-profits, known as SEIA Affiliates. These organizations have demonstrated leadership on policy and regulatory matters, actively engaged with the solar industry in their respective territories and offered grassroots support for SEIA’s federal campaigns, among other accomplishments. We are proud to call them our partners in growing the U.S. solar industry.

To see a map of the current SEIA affiliates across the country, visit www.seia.org/affiliates.

###

About SEIA®:
The Solar Energy Industries Association® (SEIA) is leading the transformation to a clean energy economy, creating the framework for solar to achieve 20% of U.S. electricity generation by 2030. SEIA works with its 1,000 member companies and other strategic partners to fight for policies that create jobs in every community and shape fair market rules that promote competition and the growth of reliable, low-cost solar power. Founded in 1974, SEIA is a national trade association building a comprehensive vision for the Solar+ Decade through research, education and advocacy. Visit SEIA online at www.seia.org.

Voice your support for the Paris Solar Energy Center

Voice your support for the Paris Solar Energy Center

Amid our current health and economic challenges, the solar industry is committed to investing in local communities, creating jobs, and increasing tax revenues with clean, homegrown energy. Large scale solar projects are currently being built in Wisconsin and new projects are on the horizon, ready to contribute to Wisconsin’s energy mix! In order to ensure success, we need you to help a critical project win approval at the Public Service Commission.

The Paris Solar Energy Center is a 200 megawatt project proposed in Kenosha County, Wisconsin. The project will supply homegrown, affordable, emission-free electricity to 55,000 homes. If approved, the Paris Solar Energy Center would more than double the solar generating capacity we have operating in Wisconsin today. Paris Solar would begin producing clean power by 2022. Want to learn more? Check out the application here.

Help us demonstrate Wisconsin’s enthusiastic support for this project and renewable energy.

RENEW Wisconsin will share the list of supporters with the Public Service Commission during the official comment period for this project.

Please add your name to our petition!

Solar for Good Program Opens Sixth Donation Round to 
Assist Wisconsin Nonprofits in Going Solar

Solar for Good Program Opens Sixth Donation Round to 
Assist Wisconsin Nonprofits in Going Solar

RENEW Wisconsin’s Solar for Good program has opened its sixth round of donations to help Wisconsin nonprofits install solar power. Grant applications are due Wednesday, May 1, 2020 at www.renewwisconsin.org/solarforgood.

Since 2017, the Solar for Good program has partnered with 75 Wisconsin nonprofit organizations to go solar. When completed, these organizations will have installed 91 solar arrays for a total of 3.24 megawatts of solar electricity, enough to power nearly 700 households.

Solar for Good is administered by RENEW Wisconsin, a statewide renewable energy nonprofit organization. Through a generous donation from the Couillard Solar Foundation, Solar for Good supplies winning nonprofits with solar panels to reduce the overall cost of installing solar power.

This is Solar for Good’s sixth award cycle, and the program has assisted nonprofits of all types and sizes across Wisconsin. The grantees include 25 houses of worship, 4 environmental conservation groups, 5 animal shelters, 17 schools and education centers, 2 veterans’ groups, and 20 housing providers.

To date, 45 organizations have completed installation of 51 solar arrays. Around $488,000 worth of grants have been dispersed from the Couillard Solar Foundation, and these grants have spurred over $4 million in solar investment across Wisconsin.

By accepting a Solar for Good award, nonprofits agree to promote the environmental and economic benefits of solar power to their communities. Winning organizations educate their members about solar power and are able to showcase their projects’ benefits.

Grant applications for Solar for Good must be received by Wednesday, May 1st 2020. Decisions and award announcements will be made on or before Wednesday, May 15th, 2020. RENEW Wisconsin plans on holding an additional round of Solar for Good funding in September of 2020.

How to apply for a solar grant

Organizations can learn more and apply at www.renewwisconsin.org/solarforgood. In order to be eligible, the organization must be a registered nonprofit organization located in Wisconsin, be in good financial standing, be ready to install solar, and agree to participate in educating community members about the benefits of solar energy. If approved for a solar panel award, all fundraising, design and installation for the solar project must be completed within 12 months.

Applications for the Spring 2020 Solar for Good cycle must be received by Wednesday, May 1st 2020. Decisions and award announcements will be made on or before Wednesday, May 15th, 2020.

For organizations looking at solar power for the first time, technical assistance grants are available to fund a solar site assessment (up to $250) or engineering review (up to $500) for their solar array. These applications will be reviewed separately from the applications for solar panel awards and will be allocated on a first-come, first-served basis.

About Solar for Good

RENEW Wisconsin’s Solar for Good initiative fosters the expansion of solar power among mission-based nonprofits in Wisconsin. Through a generous partnership with Couillard Solar Foundation, RENEW Wisconsin awards solar panels to nonprofit organizations, helping them switch to clean, renewable, solar energy. More information can be found at www.renewwisconsin.org/solarforgood/.

About RENEW Wisconsin

RENEW Wisconsin is a nonprofit organization which promotes renewable energy in Wisconsin. We work on policies and programs that support solar power, wind power, biogas, local hydropower, geothermal energy, and electric vehicles. More information on RENEW’s website: www.renewwisconsin.org.Â